Skip to content

Quotation scope, not a price list

uv flatbed printer price questions on one basis

A uv flatbed printer price is readable only after the print process, printable media, quantity, currency, destination and Incoterm are the same on every offer. Uv Flatbed Printer Sourcing coordinates that comparison. We do not publish a market rate, and we do not treat a catalog photo as a confirmed machine.

Send the bed size you need, the object height if you print formed goods, the ink channels you expect, and whether white or varnish is mandatory, preferred or unknown. Mark the shop voltage and the week the crate should reach the US address. Factories then attach their own model name to those fields.

Open equipment labels
Buyer comparing printed UV samples against a quotation checklist

Exact-model evidence to request with every price line

Bind each cell to the manufacturer and model written on that quotation. A family brochure does not answer the cell for a different machine.

Topic What the quotation should attach Who confirms it
Working envelope and process Current datasheet stating process, maximum print area in mm and object clearance Proposed supplier, naming the model
Throughput and duty cycle Speed in m2/h or objects per hour, plus resolution in dpi, pass count, media and ambient temperature Proposed supplier test note, buyer review
Ink, cure and RIP Ink set, cure method and whether the RIP license is included Proposed supplier commercial schedule
Utilities requirement Input voltage, frequency in Hz, phase, and extraction or air if the model calls for them Proposed supplier, checked against the site
Certificates Only certificates that name the exact model and the market they cover Issuer document via the supplier, not this site
Acceptance Factory acceptance test points, control interface and the specification deviation sheet Buyer quality plus the quoting factory

Document and acceptance questions around price

Which drawing revision should travel with the price?

Ask for the general arrangement that matches the quoted options, including service clearance. If the drawing revision is older than the option list, record that gap instead of assuming the bed size still matches.

How should test records be read?

A resolution or throughput number needs the chart, the media, the pass mode and the cure setting. Without that basis, keep the number in a screening column and out of the acceptance column.

What does a certificate cover?

Electrical or radio certificates, when they exist, apply only to the configuration printed on them. Ask the supplier to say whether white ink, a different lamp or a custom jig changes that coverage.

Where do exclusions sit in the price?

Ink for production, spare printheads, installation labor, local electrical work and duties may sit outside the machine line. List them beside the price so two offers can be read together. See the workflow and the brief.

Prepare a specification review

Write the open items in the inquiry: media you must print, print area, utilities on site, quantity and destination. Mention drawings you can send after contact. This page does not add an upload field.

  • Mandatory, preferred and unknown marked on each spec.
  • Optional budget with currency and per-unit or whole-order basis.
  • Supplier preference labeled as high-end, mid-range, budget or undecided.

The review asks factories to price the same packet. It does not pre-approve fit.

Request Factory Quotes Use the full brief page